North Carolina’s Trusted and Certified Helical Pier Experts
Engineered Foundations That Last a Lifetime for Residential, Commercial, Industrial, and Municipal Projects.

GoliathTech Piers, Trusted, Tested and Code Compliant
















Do It Once, Do It Right—
GoliathTech Helical Pier Foundations Built to Last!

Hi, I’m Alan Parker !
Since 2019, we’ve delivered hundreds of helical-pier foundation projects across North Carolina. Whether you’re building a new home, a deck, or a commercial structure, our custom-engineered screw-pile solutions provide the stability and reliability you need — even where traditional concrete fails.
Built for Tough Soil:
We specialize in new construction projects where soil conditions are poor or unstable — delivering strong, level foundations where concrete may not suffice.
Start Right. Build Right.
Helical Pier Installation Services for All Project Types
GoliathTech Piedmont proudly serves its local community with the installation of life-lasting foundations, expertly tailored for every type of project.




What Makes The GoliathTech Piers Stand Out?
Discover the difference of working with GoliathTech’s North Carolina’s trusted helical piers.

Industry-Leading Lifetime Product Warranty

Highest-Grade Structural 60 KSI Steel

Patented Fixed Adjustable Pile Heads

Goliath Connect™ Secure Joint System

Versatile Pile Sizes And Customizable Solutions

Installed In Less Than A Day

Minimal Impact On Landscape

Suitable In All Soil Conditions

Removable, Reusable, 100% Recyclable

Year-Round Installation

Perfectly Level Structure

Ideal For Restricted Spaces
Why Choose GoliathTech Piedmont?

Extensive knowledge of North Carolina’s unique soil types and climate challenges.

Fully compliant with North Carolina’s building codes, ensuring safe and reliable installations.

Certified specialists in helical pier installations, offering dedicated expertise for contractors, engineers, and architects.

Offering an industry-leading lifetime warranty for peace of mind and long-term investment protection.





A Simple 4 Step Installation Process
Steps 2 and 3 is where the screw pile installation occurs

STEP 1
Planning
Define your project’s scope, timeline, and budget to prepare for a seamless start.

STEP 2
Consultation and Estimate
Our certified installers analyze your needs and provide a tailored solution with a precise estimate.

STEP 3
Installation
Our certified experts in North Carolina install helical piers quickly and precisely, with adjustments made for maximum stability.

STEP 4
Ready for Construction
Start building immediately on a clean, secure, and durable foundation.
What Our Customers in North Carolina Are Saying
Sylvester Fontenelle, North Carolina Homeowner

Todd Hammond, Hammond Construction
Have Questions? We Have Answers!
How much weight can a helical pier support?
Since this depends on the soil type, it’s at the time of installation that the weight that each helical pier can support will be determined. It’s important to note that the more compact the soil, the greater the bearing capacity of the helical pier. This capacity (also known as compression or tension) is confirmed at the time of installation, in accordance with the quality standards and requirements met by all GoliathTech helical piers. In some cases, a certificate may be issued by an engineer to validate the compliance of the upcoming work.
How much does a helical pier cost?
Contrary to popular belief, GoliathTech helical piles are a cost-effective long-term solution. However, there are a number of factors to consider when estimating the cost, such as the structure to be supported, soil type, length of screw pile required, and the accessibility of the site. Please contact GoliathTech Piedmont to learn more.
What is the recommended distance between each helical pier?
Depending on industry standards and the type of structure to be supported, a distance of 8 to 10 feet is generally recommended between each screw pile.
What are the possible approaches if there's a rock in the soil?
In most cases, we can shift the rock slightly to install the helical pile. If we are unable to move the rock due to its size, then the pile can be installed in another location, providing the project allows it. If the location of the structure cannot be changed, we will typically use a mini excavator adapted to this type of scenario. This will allow us to install the screw pile leaving as small of a footprint as possible.
Can helical piers be installed under an existing structure?
Absolutely! Although, helical piles must be installed in close proximity to the structure being supported. To install helical piles in the middle of an existing structure, access must be provided. For example, it is recommended to remove a few boards from a wooden deck to install helical piles in an otherwise inaccessible area.

Your Foundation Starts Here
Contact Your Trusted GoliathTech Piedmont Expert Today





